Our Projects

References

We support companies throughout Switzerland with innovative energy solutions. Alternative energy production, energy storage, and digitalization are crucial for this transformation.

Check your site’s potential
Battery Storage

Battery Energy Storage Systems (BESS)

SABAG Rothenburg: BESS 5 MWhOperational
View details
Large-Scale Battery Storage

SABAG Rothenburg: BESS 5 MWh

Power3.45 MW
Capacity5 MWh
ManagementWWZ AG
LocationRothenburg, LU
CommissioningMay 2026
Municipality of Eschenbach: BESS 15 MWhIn Progress
View details

Gravel plant of the Municipality of Eschenbach, site of the planned system.

Large-Scale Battery Storage

Municipality of Eschenbach: BESS 15 MWh

Power3.45 MW
Capacity15 MWh
FinancingNRG Solutions AG
ManagementNRG Optimization AG
LocationEschenbach, LU
CommissioningQ2 2027
Site Optimization 10 MWhIn Progress
View details

Symbolic image. Does not show the built installation.

Large-Scale Battery Storage

Site Optimization 10 MWh

Power3.45 MW
Capacity10 MWh
FinancingPrivate
ManagementNRG Optimization AG
LocationCentral Switzerland
CommissioningQ4 2027
Gravel and Concrete Plant 10 MWhIn Progress
View details

Symbolic image. Does not show the built installation.

Large-Scale Battery Storage

Gravel and Concrete Plant 10 MWh

Power3.45 MW
Capacity10 MWh
FinancingNRG Solutions AG
ManagementNRG Optimization AG
LocationGerman-speaking Switzerland
CommissioningQ4 2027
Front of the Meter 15 MWhIn Progress
View details

Symbolic image. Does not show the built installation.

Large-Scale Battery Storage

Front of the Meter 15 MWh

Power5 MW
Capacity15 MWh
FinancingPrivate
ManagementNRG Optimization AG
LocationGerman-speaking Switzerland
CommissioningQ3 2027
Megawatt Charging Hub 40 MWhIn Progress
View details

Symbolic image. Does not show the built installation.

Large-Scale Battery Storage

Megawatt Charging Hub 40 MWh

Power20 MW
Capacity40 MWh
FinancingNRG Finance AG
ManagementNRG Optimization AG
LocationCentral Switzerland
CommissioningQ4 2027
Front of the Meter 60 MWhIn Progress
View details

Symbolic image. Does not show the built installation.

Large-Scale Battery Storage

Front of the Meter 60 MWh

Power20 MW
Capacity60 MWh
FinancingNRG Finance AG
ManagementNRG Optimization AG
LocationGerman-speaking Switzerland
CommissioningQ1 2028
Lustenberger Malters 783 kWhOperational
View details
Large-Scale Battery Storage

Lustenberger Malters 783 kWh

Power375 kW
Capacity783 kWh
FinancingPrivate
ManagementPrivate
LocationMalters (LU)
CommissioningJune 2026
Marti Technik Baustelle 258 kWhOperational
View details
Large-Scale Battery Storage

Marti Technik Baustelle 258 kWh

Power125 kW
Capacity258 kWh
FinancingPrivate
ManagementPrivate
LocationOberburg (BE)
CommissioningMay 2026
Hofgenuss Rain 215 kWhOperational
View details
Large-Scale Battery Storage

Hofgenuss Rain 215 kWh

Power125 kW
Capacity215 kWh
FinancingPrivate
ManagementPrivate
LocationRain (LU)
Commissioning30.10.2025

Your project could be featured here

Contact us for a no-obligation consultation about your energy solution.

Get in Touch

A similar project for your site?

Together we assess whether a comparable project is feasible at your location.

Or directly:

Headquarters

NRG Solutions AG
Platz 4
6039 Root D4

Location

Rue des Moulins 51
2000 Neuchâtel
30 minutes, free & non-binding. Online via Microsoft Teams.

Member of

VSEAEE SuisseSwiss CleantechIHZNELUCNCIEnergie HubNachhaltigkeitsnetzwerk

Before you book a meeting, one short question:

Do you have at least 1 MW of grid connection capacity on site?

Loading calendar

The calendar is loaded from zcal, Inc. (USA). This sends your IP address, your browser identification and the page you are on to the provider. Privacy Policy

Ready for a conversation?

Book a meeting ↑
Book a meeting